Lawson CyberField guide · Network Talk about scope

01 / Network · Field guide

Four weeks, start to finish.

The four weeks start the day our read-only access works. How the Fix-and-Prove Sprint runs, for the business owner, the IT lead or MSP, and anyone who has to sign off on a change window.

01 / Week 1: agree the scope, then score it

In the first call we agree four things:

Then we run read-only checks. Nothing changes. You get every finding, what it costs you in SPRS points, and your starting score.

Don't send configs or diagrams through the website form. We'll set up a proper way to share them.

02 / Who does what

You, the business owner
Decide what's in scope and who can approve changes. Sign off on the handoff.
Your IT lead or MSP
Gives us access, tells us which services can't go down, and runs your change process. If you have an MSP, they stay your MSP. We work alongside them.
Us
Run the checks, write up the findings, plan and make the approved fixes, and hand over the evidence.

03 / Weeks 2 and 3: the change window

We fix the firewall and switch findings in one planned window in week 3. In week 2 we agree with your change approver:

  1. What's changing, and what might blink while it does.
  2. When the window is, and the latest time we'll stop and roll back.
  3. How we roll back, and that we've tested it.
  4. How your team will check its own services afterward.

If any of these is unclear, we don't start. If something breaks that we didn't expect, we roll back first and talk second.

04 / What a finding looks like

Made-up example · Not a real client

Two switches still accept Telnet

What we saw
Two of six access switches allow Telnet on their management lines. Telnet sends the admin password in clear text.
What it breaks
NIST SP 800-171 3.4.7 (disable nonessential protocols, 5 points) and 3.5.10 (send passwords only in encrypted form, 5 points). The real report names the STIG rule ID too.
The fix
Allow SSH only on the management lines. Made in the week-3 window, with the old config saved and the rollback tested first.
The proof
A Telnet attempt to each switch fails, an SSH login works, and the before and after configs are filed next to the finding.

Not every finding is a clean pass or fail. Some checks need evidence a config can't show, like whether logs actually reach your log server. We mark those "not verified" and say what would settle them, instead of guessing.

05 / Week 4: the handoff

We walk through it with you, and you sign off when it matches what we agreed.

06 / The worksheet

A one-page checklist of everything above: scope, people, access, the change window, and the handoff. Fill it in with your IT lead before the first call, or with us during it. Keep it in your own files.

Download the worksheet

The fine print

This guide explains how we work. Your statement of work sets the actual scope, price, and terms. The score covers the requirements the Sprint checks; anything outside it, like your policies, is scored as you currently report it. We don't write policies, and we don't certify you. Only an authorized C3PAO certifies.

Further reading: NIST SP 800-128 on controlled changes and back-out plans, and NIST SP 800-171A on how requirements are assessed.

Back to network services · Book a score check-in